「EO相殺/en」の版間の差分

提供:Tsubopedia
(ページの作成:「Multiple switching period of the start and end overlaps the EO information, and by performing the offset process. <br /> Specifically, the sort key, except the star...」)
編集の要約なし
1行目: 1行目:
<languages />
<languages />
Multiple switching period of the start and end overlaps the [[EO]] information, and by performing the offset process. <br />  
Multiple switching period of the start and end overlaps the [[EO]] information, and by performing the offset process. <br />  
Specifically, the sort key, except the start and end design change information of the same data | compares the [[changeover date EO changeover date]], the data of one and [[start changeover date | start EO changeover date]], but the other [[exit changeover date | If equal, to 1 data by clearing the design change information with the end EO changeover date]]. <br />  
Specifically, the sort key, except the start and end design change information of the same data | compares the [[EO切換年月日|changeover date EO changeover date]], the data of one and [[start changeover date | start EO changeover date]], but the other [[exit changeover date | If equal, to 1 data by clearing the design change information with the end EO changeover date]]. <br />  
If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO.
If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO.

2014年8月20日 (水) 02:01時点における版

<languages /> Multiple switching period of the start and end overlaps the EO information, and by performing the offset process.
Specifically, the sort key, except the start and end design change information of the same data | compares the changeover date EO changeover date, the data of one and start EO changeover date, but the other If equal, to 1 data by clearing the design change information with the end EO changeover date.
If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO.