「EO相殺/en」の版間の差分

ページの作成:「Multiple switching period of the start and end overlaps the EO information, and by performing the offset process. <br /> Specifically, the sort key, except the star...」
(ページの作成:「EO Offser」)
 
(ページの作成:「Multiple switching period of the start and end overlaps the EO information, and by performing the offset process. <br /> Specifically, the sort key, except the star...」)
1行目: 1行目:
<languages />
<languages />
開始・終了の切換期間が重複する複数の[[設変]]情報について、相殺処理を行うこと。<BR>
Multiple switching period of the start and end overlaps the [[EO]] information, and by performing the offset process. <br />  
具体的には、開始・終了設変情報を除くソートキーが同じデータの[[切換年月日|EO切換年月日]]を比較し、一方のデータの[[開始切換年月日|開始EO切換年月日]]が、他方の[[終了切換年月日|終了EO切換年月日]]と等しい場合、設変情報をクリアしてデータを1件にする。<BR>
Specifically, the sort key, except the start and end design change information of the same data | compares the [[changeover date EO changeover date]], the data of one and [[start changeover date | start EO changeover date]], but the other [[exit changeover date | If equal, to 1 data by clearing the design change information with the end EO changeover date]]. <br />  
一方のデータの開始EO切換年月日が、他方の終了EO切換年月日と異なる場合は、EO相殺処理は行わない。
If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO.
7,764

回編集