編集の要約なし
(ページの作成:「Multiple switching period of the start and end overlaps the EO information, and by performing the offset process. <br /> Specifically, the sort key, except the star...」) |
編集の要約なし |
||
1行目: | 1行目: | ||
<languages /> | <languages /> | ||
Multiple switching period of the start and end overlaps the [[EO]] information, and by performing the offset process. <br /> | Multiple switching period of the start and end overlaps the [[EO]] information, and by performing the offset process. <br /> | ||
Specifically, the sort key, except the start and end design change information of the same data | compares the [[changeover date EO changeover date]], the data of one and [[start changeover date | start EO changeover date]], but the other [[exit changeover date | If equal, to 1 data by clearing the design change information with the end EO changeover date]]. <br /> | Specifically, the sort key, except the start and end design change information of the same data | compares the [[EO切換年月日|changeover date EO changeover date]], the data of one and [[start changeover date | start EO changeover date]], but the other [[exit changeover date | If equal, to 1 data by clearing the design change information with the end EO changeover date]]. <br /> | ||
If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO. | If it is different from the end date of the EO switch other, start date EO switching of one of the data does not perform the offsetting of EO. |