「完成検査/en」の版間の差分

編集の要約なし
(ページの作成:「#Have the structure as the model that received designation, a device and performance.#Meet the rule of the preservation standard of the road haulage vehicle.#I did a repo...」)
編集の要約なし
2行目: 2行目:
With the examination of completion, an all quantity completion inspection section of the production headquarters, the pulling out completion inspection section of the guarantee of quality headquarters carry out completion inspection by "the completion study implementation point", "the exhaust pulling out completion study implementation point" with a thing that a car and a device possess the next requirements or inspect based on car model designation rule Article 7, device designation rule Article 7.
With the examination of completion, an all quantity completion inspection section of the production headquarters, the pulling out completion inspection section of the guarantee of quality headquarters carry out completion inspection by "the completion study implementation point", "the exhaust pulling out completion study implementation point" with a thing that a car and a device possess the next requirements or inspect based on car model designation rule Article 7, device designation rule Article 7.


#Have the structure as the model that received designation, a device and performance.#Meet the rule of the preservation standard of the road haulage vehicle.#I did a report (report of Road Vehicles Law Article 29 Clause 2 or Article 30) [[車体番号|number of cars number]] And the model of the motor being chopped definitely.
#Have the structure as the model that received designation, a device and performance.#Meet the rule of the preservation standard of the road haulage vehicle.#I did a report (report of Road Vehicles Law Article 29 Clause 2 or Article 30) [[車台番号|number of cars number]] And the model of the motor being chopped definitely.


== 関連項目 ==
== 関連項目 ==
1,277

回編集